Saturday, March 27, 2010

TRAIL REPORT

Al Benson and I worked on the East River Trail (next to the river) today. Al cut down several trees with his old chainsaw and I did some light lifting. One of the trees was huge and overhanging the trail--dangerous! Al also reconfigured the trail in a couple of places, both where the trail was washed out. Anyways (as we say) the trail is now rideable! Also, the Upper East
River Trail (aka the Ridge Trail) is rideable. To cross the stream, look for the rocks to walk on. Al wants to build a bridge. The West River Trail (on the other side of the river) is fine, Plum Creek is OK, and the trail south of the Fire Station is OK too including the return up the hill.

No comments: